The water cribs in Chicago are structures built to house and protect offshore water intakes used to supply the City of Chicago with drinking water from Lake Michigan. Water is collected and transported through tunnels located close to 200 feet beneath the lake, varying in shape from circular to oval, and ranging in diameter from 10 to 20 feet. The tunnels lead from the cribs to one of two water purification plants located onshore, the Jardine Water Purification Plant (the world's largest) and the Eugene Sawyer Water Purification Plant, where the water is then treated before being pumped to all parts of the city as well as 118 suburbs.
The city has had nine permanent cribs of which six are still standing and two are in active use.
Video Water cribs in Chicago
Current and former water cribs
Maps Water cribs in Chicago
Two-Mile Crib
The Two-Mile Crib was constructed as part of a scheme by Ellis S. Chesbrough in 1865, to help with the purification of the water because of damage caused by the city dumping sewage into the lake. Construction of the crib began in May 1864, miners and workers worked 24 hours a day and six days a week. The total completion of the project was in March 1867 and cost the city $380,784. Purified water was pumped to the Chicago Avenue Pumping Station which still stands to this day on North Michigan Avenue.
Four-Mile Crib
The Four-Mile Crib was put into service in 1891 to help with the problem of getting uncontaminated water to Chicago and various neighborhoods. To deal with this, a new crib was built even farther than the Two-Mile Crib. The brick alone cost $472,890.93, but the total project cost was $1,526,143.68. This crib was special, as there was a steam heating plant installed in 1898. This kept the crib at a temperature of 70 degrees and allowed plant workers to reside there during the winter, who helped to stop the formation of ice. In 1932, the Bureau of Lighthouses reported that a submarine cable had been laid and two rooms had been added on to the crib.
68th Street Crib / Edward F. Dunne Crib
The 68th Street Crib was built in 1892 two miles offshore the eastern end of 68th Street. A cement hexagon-shaped crib with a brick structure atop, it originally supplied two tunnels, a 20-foot diameter tunnel to the Jardine Water Purification Plant and a 10-foot diameter tunnel to the South Water Purification Plant (later renamed to the Eugene Sawyer Water Purification Plant). The crib was equipped with a navigational warning light atop a steel-skeleton lighthouse and a fog bell that tolled every 12 seconds when needed.
The Edward F. Dunne Crib was built in 1909. Named after Chicago Mayor Edward Fitzsimmons Dunne, who was in office at the time crib plans were approved, the 110-foot diameter circular crib stands in 32 feet of water and houses a 60-foot diameter interior well connected to two new tunnels. The Dunne Crib is situated 50 feet from the 68th Street Crib and accessible by a steel footbridge, allowing one set of keepers to service both cribs.
During the construction of the tunnel to the Edward F. Dunne Crib, a temporary crib known as the Intermediate Crib was built along the tunnel route, 7,500 feet from shore. On the morning of January 20, 1909, a fire broke out on the Intermediate Crib in a wooden barracks which housed tunnel workers. Approximately 70 men perished in the fire or drowned attempting to escape it. Survivors took refuge on floating cakes of ice and were rescued by boat.
Carter H. Harrison Crib / William E. Dever Crib
The Carter H. Harrison Crib replaced the Two-Mile Crib in 1900, which was later replaced by the William E. Dever Crib built alongside it in 1935. As the demand increased for water this meant that the Harrison Crib continued in service until 1997. In 1998 the tunnels leading from the Harrison Crib to shore were drained for inspection, a process that was surrounded by controversy. Some experts feared that pumping the tunnels dry would result in a catastrophic collapse, while others guaranteed that collapse was not possible. Portions of the tunnel did in fact collapse. City lawyers soon filed suit against the engineers and contractors. The suit charged that the engineers, Alvord, Burdick & Howson, were negligent for advising the city that it was safe to drain the tunnels. It also charged that Luedtke Engineering Co., of Michigan, did the work in a way that caused the collapse. As a result, the city spent $5.3 million to fill in a portion of the tunnel under Lake Shore Drive to prevent a possible additional collapse.
Wilson Avenue Crib
The Wilson Avenue Crib is located approximately two miles east of Montrose Point. Work on the 90-foot diameter crib began in 1915 and was completed May 1, 1918 after a delay to correct an out-of-plumb structure due to settling. The superstructure is rough-hewn granite block atop a steel caisson enclosing a 40-foot diameter inner well chamber.
Originally supplying eight miles of water tunnels, the crib has since been designated as a standby crib and is scheduled for demolition in the city's 2015-19 Capital Improvement Program.